Work Management System -wms- Adnoc - Pdf

| OE Pillar | WMS Contribution | |-----------|------------------| | HSE | PTW, risk assessment, SIMOPS, LOTO | | Asset Management | Preventive & predictive maintenance planning | | Continuous Improvement | Work feedback loop and KPI monitoring | | Competency | Role-based WMS training and assurance |

- Weekly and daily scheduling windows (ADNOC common practice) - Coordination with operations for system/plant availability - Integrated scheduling with Turnarounds (TA) & Shutdowns

| Priority | Definition | Planning Window | Execution Window | |----------|------------|----------------|------------------| | P0 (Emergency) | Imminent HSE or major production loss | 0 hr | Immediate | | P1 (Urgent) | Significant degradation | 4-8 hrs | 24 hrs | | P2 (Planned) | Routine corrective/preventive | 2 weeks | 4 weeks | | P3 (Deferrable) | Minor improvement / low risk | Next shutdown | Next opportunity |

- Weekly WMS review meetings - Root cause analysis for schedule breaks - Lessons learned from turnarounds work management system -wms- adnoc pdf

- Permit to Work (PTW) process (cold, hot, confined space) - Isolation management (LOTO – Lock Out Tag Out) - Real-time progress tracking

2.1 Lifecycle Asset Management 2.2 HSE First: Permit to Work (PTW) Integration 2.3 Reliability Centered Maintenance (RCM) 2.4 Competency Assurance

- Maintenance Planner / Scheduler - Operations Authority - Maintenance Supervisor - Contractor / Vendor - CMMS Data Steward Process deviations - Priority classification (Emergency

**4.1 Work Identification** - Sources: Inspections, Operator rounds, Condition monitoring, Process deviations - Priority classification (Emergency, Urgent, Routine, Planned) - Task list creation - Resource estimation (Manpower, tools, materials) - Risk assessment (HAZID, JSA)

6.1 Use of Maximo / SAP PM (typical ADNOC CMMS) 6.2 Mobile Workforce Management (Tablet-based job packs) 6.3 Dashboard & Analytics (Power BI / ADNOC Panorama) 6.4 Future: AI for predictive work scheduling

- A – Typical Work Order Coding Structure (ADNOC) - B – Priority Matrix (Safety, Production impact) - C – Job Safety Analysis (JSA) Template - D – Abbreviations and Definitions Sample Content (Page 1 – Executive Summary Style) 1. Introduction materials) - Risk assessment (HAZID

3.1 High-Level Process Flow 3.2 Interfaces with Other Systems (ERP, CMMS, Digital Twin)

5.1 Common PTW workflow (Issuing Authority, Performing Authority) 5.2 Simultaneous Operations (SIMOPS) Management 5.3 Gas test and safety requirements

- Technical report & as-maintained data - Feedback loop into maintenance strategy - KPIs data capture (Schedule compliance, backlog)